Though work was previously estimated to be completed in June, significant weather related delays have pushed back the Lily Pool’s reopening. Though the majority of the carpentry is complete, there is still critical finishing work and detailed metal roofing yet to do. The remaining work requires dry, temperate conditions so as not to jeopardize the integrity of the seal or the longevity of the intricate structure.

restoration update blog

Consistent rain has been good for plants and fireflies, but has hindered progress on the final aspects of the pavilion reconstruction. The persnickety, bespoke roof design requires consecutive dry days to ensure moisture doesn’t get trapped and prematurely rot the wood beneath. Stretches of dry weather are also needed to complete the staining and fine finishing work.

At the same time, weather can’t be too hot. Though work continued through the recent extreme heat, progress was slowed considerably by the overheating of tools and equipment.  

Because of how weather dependent the final stages are, we are refraining from estimating a specific date until we are closer to completion. Your patience is greatly appreciated and will allow for the meticulous realization of Caldwell’s pavilions.

Lily Pool Restoration Blog

Stay in touch with the Conservancy through our blogs and newsletter for continuing updates and check out our events calendar for limited opportunities to visit the Pool while construction is ongoing.   

Related Posts